Member Portal Join Now Resources
IAF CRP · First Edition · Version 1.0

Corporate Recognition for Manufacturers & Assemblers

A single corporate recognition framework for accountable automotive OEMs, manufacturers, assemblers and controlled industrial operations.

24Common sections
8Industrial profiles
10Technology domains
200Identified requirements

Industrial profile map

Recognition follows the responsibility actually held

An organisation may use more than one profile, but every legal entity, site, product family, outsourced operation and market responsibility must remain explicit in the approved scope.

OEM

Product-responsible brand owners

Organisations accountable for products placed on the market under their brand, including outsourced manufacture.

VEH

Vehicle manufacturers & final integrators

Passenger, commercial, bus, motorcycle, trailer, micromobility and declared special-purpose production.

ASM

Contract manufacturers & assemblers

Assembly, kit manufacture and contract production under another party’s design or product responsibility.

CMP

Component & system manufacturers

Parts, subassemblies and functional systems for original, replacement and related automotive applications.

MAT

Materials & special processes

Materials, chemicals, coatings, castings and hidden-characteristic manufacturing processes.

DIG

Electronics & software producers

Embedded electronics, software and directly related automotive digital products and services.

REM

Remanufacturers & converters

Controlled remanufacture, conversion, refurbishment and automotive second-life production.

EQP

Equipment & tooling manufacturers

Production equipment, tooling, fixtures, automation and associated engineering services.

Requirement architecture

A 200-requirement map with no compensating score

Every applicable requirement is evaluated independently. A strong score elsewhere cannot compensate for failed safety, integrity, competence or an unsupported scope.

Framework layerStructurePurpose
Corporate baseline96 requirements in 24 sectionsGovernance, safety, people, design, supply, production, testing, traceability, lifecycle support and improvement.
Industrial profiles8 profiles × 4 requirementsAdds controls for the actual manufacturing responsibility and output type.
Technology domains10 modules × 4 requirementsApplies triggered controls for electrification, software, automation, materials, circularity and future mobility.
Internal directives8 directives × 4 requirementsControls eligibility, sites, audit sampling, decisions, status, records and programme operation.

Evidence-led recognition

From corporate claim to verified implementation

01

Define the accountable boundary

Identify entities, factories, support functions, product families, markets, technologies and exclusions.

02

Adopt the quality basis

Approve the CRP baseline and map every additional IAF text claimed as implemented.

03

Build operating evidence

Show at least six months of operation, an internal audit, management review and completed cases.

04

Audit sites and processes

Provide safe access to all initial factories, critical outsourced operations, shifts and original records.

05

Close every finding

Contain risks, correct causes and demonstrate effectiveness before the initial decision.

06

Release bounded status

A separate three-person panel determines exact legal entity, sites, activities, term and public wording.

Decision readiness

Readiness depends on actual production history

Minimum decision gates

  • Clear legal entities, sites and scope rows
  • At least six months of implemented operation
  • One completed internal audit and management review
  • Three production or delivery cases per family/site
  • Applicable profiles and technology modules
  • Physical coverage of factories and critical outsourcing
  • Original release, traceability and test evidence
  • All applicable requirements Met before initial grant

Controlled document set

Read, prepare and preserve the evidence

Use the Programme Standard as the authoritative framework. The manuals, guides and controlled forms implement it and cannot weaken its requirements. Each file opens as a PDF in a new tab.

Standard & Internal Directives

The complete corporate baseline, profiles, technology domains, directives and annexes.

45 pagesOpen PDF

Applicant Guide

Scope definition, adoption, evidence preparation, site access and decision readiness.

8 pagesOpen PDF

Corporate Recognition Application

Legal identity, requested profiles, sites, activities, adoption and declarations.

11 pagesOpen PDF

Scope, Sites & Adoption Schedule

Controlled entity, site, product, activity and quality-adoption records.

17 pagesOpen PDF

Self-Assessment & Evidence Dossier

Implemented practice, effectiveness, gaps, indicators and source-evidence mapping.

31 pagesOpen PDF

Implementation & Evidence Manual

Practical controls for deployment, production evidence, traceability and improvement.

11 pagesOpen PDF

Assessment Checklist

Assessor-facing applicability, evidence, findings and decision record.

73 pagesOpen PDF

Audit & Recognition Manual

Audit planning, sampling, findings, panels, surveillance, appeals and status actions.

16 pagesOpen PDF

Status & Mark Usage Rules

Approved wording, verification, mark limits, corrections and misuse response.

6 pagesOpen PDF

Governance & Monitoring Toolkit

Controlled operational records for the recognition and monitoring lifecycle.

25 pagesOpen PDF

Prepared decision controls

Important periods and safeguards

ControlPrepared periodMeaning
Implemented historyMinimum 6 monthsIncludes one internal audit, one management review and completed family/site cases.
Recognition termMaximum 3 yearsNo automatic extension; renewal should begin at least six months before expiry.
SurveillanceMonths 12 and 24Includes annual physical-site coverage under the prepared framework.
Initial decisionAll applicable requirements MetNo open initial finding or score average can substitute for complete closure.
Serious incident noticeWithin 48 hoursApplies to credible serious safety, falsification, scope failure or major evidence compromise.
Interim suspension reviewWithin 5 business daysA three-person panel reviews urgent protective action.

These controls become operational only through an approved IAF adoption and implementation notice.

Build a factory-backed evidence dossier

Start with the Applicant Guide, freeze the entity/site/product scope and collect actual production, release and traceability evidence. Contact IAF before presenting any dossier as a live recognition application.

IAF’s Global Member Network

From regional OEMs to global tech pioneers, IAF unites a diverse community committed to shaping tomorrow’s mobility.

  • Active global outreach across key mobility regions
  • Strategic onboarding of founding corporate & expert members
  • Monthly roundtables, knowledge-sharing & draft consultations
  • Early-stage collaborations with research & policy networks

…and many more benefits designed to amplify your impact in the evolving mobility ecosystem.

Join the Federation

Join Us in Shaping the Future of Global Mobility

Be part of a powerful movement driving safer, smarter, and more sustainable transportation systems worldwide. Connect with leaders, influence policies, and co-create the automotive innovations of tomorrow with the International Automotive Federation.